The Hapag Lloyd Mega boxer LNG refit is in full swing

Hamburg, 21. Mai 2019 – Basic Design from TECHNOLOG nearly finalized.

This 3D drawing shows today’s status of development. The LNG tank will be placed short in front of the engine room. It consists of an exoskeleton arrangement with a GTT MARK-III barrier design. This very space optimizing arrangement secures a long shipping range at low loss of cargo space.

By converting to LNG the vessel’s EEDI will be further decreased by 31%. The archived EEDI will be only 40% of the required index in 2025. In other words: the vessel will be twice as efficient as required. The 3D drawing further shows the LNG-Processing room, the bunker station and the additional vent masts. The engineering of all ventilation and venting will be finalized soon.

Your contact

Albrecht Delius

Head of Marketing & Business Development